avante_residential_1.jpg

Residential Concrete Services

The leader in residential concrete because at Avante Concrete we take immense pride in our work and no job is too big or too small.

Whether you want a new concrete driveway, a concrete patio, concrete sidewalks, a concrete pool deck, a new garage floor or anything in between, Avante Concrete is here for you! We can look after your entire project for you - from demolition through to the finished project! Whether you are looking for modern appeal or a rustic look; from a bold design to a subtle change. With an array of colours, patterns and borders to choose from – the possibilities are endless. Give us a call today for your free estimate!

Driveways

Your home's "welcome mat" and a big part of it's first impression.

Stairs and Ramps

A proper set of steps are important for safety and to beautify your home.

Retaining Walls

and Planters

Retaining walls and concrete planters are both a way to enhance your property and make it more usable.

Patios

Entertain, relax, and enjoy a patio that fits the needs of your family year round.

Sidewalks

Your sidewalk can added an amazing amount of curb appeal to your home.

Trench Drains

We are experts at installing trench drains!

Pool Decks and Coping

A stunning pool is enhanced and protected with a proper deck and coping.

Garage and Carport Floors

A well-kept and attractive concrete floor is both a practical and smart investment.

Fire Tables and Custom Projects

If you can imagine it we can make it a possibility. Bring us your ideas!

* Please note these are esimates only and will depend on size and scope of the project as well as other factors.

Concrete can be walked on within 48 hours and driven on after 7 days of concrete pour.
What to expect for your concrete project.*
Step  1
Demolition & Excavating

Typically 1-2 days

Step  2
Forming

To follow within 1 - 2 days 

Step  3
Grading & Compacting

Typically 1-2 days

Step  4
Pre- Concrete Pour

Inspection site visit by Concrete Foreman

Step  5
Concrete Pour

Within 1-5 days depending upon weather conditions

Step  6
Clean-Up

No sooner than two days after concrete pour

Step  7
Sealing (if applicable)
Concrete washed and sealed
Exposed Aggregate: minimum of 7 days after concrete pour
Stamped Concrete: minimum of 3 days after concrete pour
FINISHES

Broomed

Smooth

Stamped

Exposed 

1974

Year

Established

Accredited

1994

bbb-Arating-White.png

BBB

Rating

icba-logo-2015_white.png

ICBA

Member

TESTIMONIAL

"The gentlemen doing the demo were extremely professional and courteous during the work. Please pass along my gratitude to them and to management. They’re a great and incredibly hardworking group.
Thanks"